OVER 132.000 m2
Our facilities are modern and have the most cutting-edge production systems in the world. Of the more than 132.000 m2 they occupy, 58.715 m2 are actually built.
CASTING
Total area of 82.020 m2, with a built area of 32.000 m2.
Capacity: 122 kt/year:
- Cupola furnace: 18/20 t/hour
- Furnaces: 7/8 t/hora
Materials: Grey and Nodular Iron
MACHINING
Total area of 50.485 m2, with a built area of 26.715 m2
son construidos.
162 CNC Machines
29 Machining lines
Products: discs, steering knuckles, drums and engine parts